Back Building RebuildThe Local LDS church donated the doors and windows. The project was completed by volunteersIn need of a new door, windows & siding Windows & Siding being installedConcrete floor was miserably coldInsulating the floor
New StairsMay 2012 local Mormon missionaries tore out the old and rotting stairsMay 2012 local Mormon missionaries building a proper set of stairs under William’s guidanceProper stairs – mission accomplished with the help of volunteers
Nehemiah ProjectJune 2011 new stairs into side entrance, removed a lot of trash under house (filled up 30 yd dumpster), insulated floors and ceiling, re-connected duct work for HVAC system, cleaned debris outside, re-roofed back section of house.June 2011 New roof going on for front porch. Old roof leaking/rotting and built wrong in first place. Projects completed this week on this house: new stairs into side entrance, removed a lot of trash under house (filled up 30 yd dumpster), insulated floors and ceiling, re-connected duct work for HVAC system, cleaned debris outside, re-roofed back section of house. 15 kids; several adults; and lots of goodwill.This is the all-volunteer group that is helping repair this house this week. 15 kids, ages 12-15 helping clean and repair. Very encouraging.Roof building with Nehemiah projectJune 2011 Unexpected issue: backed up septic. Raw sewage in basement.